Construction Drawings and 3D Render Standards for Stands

Most stand problems start at the drawing stage: no buildable dimensions, node details or material callouts, so factories guess and site rework follows.

01How renders and construction drawings differ

RenderConstruction drawings
Question answeredWhat it looks likeHow it is built
Core contentLook, atmosphere, perceived materialsDimensions, structure, nodes, material codes
Who reads itThe clientFactory, build crew, venue reviewers
Can it be built from directlyNoYes

02What a complete set of construction drawings contains

  • Plans and elevationsDimensions, levels, opening positions and structural landing points for every face
  • Structural node detailsHow the frame connects, where loads land, what profile sizes are used
  • Material calloutsMaterial, finish and thickness for every panel, coded to the material schedule
  • Power layoutNumber and wattage of fixtures, cable routes, distribution board location
  • Full dimension chainNot a few key dimensions but continuous dimensioning from one end to the other
  • Bill of materialsName, specification, quantity, unit — ready to order from
  • Title block and versionA standard title block marked with version number and date, so the factory never builds from old drawings

03How detailed should the 3D renders be

3D images are not just visuals for the client. In our studio, the required views are specified:

ViewWhat it must make clear
FrontOverall proportions, main visual, fascia height
SideDepth, side walls, open sides
TopFloor zoning, circulation, meeting area position
Detail close-upKey finishes, material details, lighting effects
Eye levelHow the main visual reads from the visitor aisle
Common problem

Designs with only a front render often arrive on site with no design for the sides, top or back. Four-side-open stands are especially prone to this.

04From drawings to build: the workflow

① Concept design

  • Set direction, spatial relationships, main visuals

② Final render

  • Client confirms form, colour and perceived materials

③ Construction drawing development

  • Dimensions resolved, structure feasible, materials purchasable

④ Drawing review

  • Factory, build team and designers check the drawings together for conflicts

⑤ Venue submission

  • Structural and electrical drawings submitted to the venue for review

⑥ Production order

  • Cut to the bill of materials, with the version number marked

05Five common drawing problems

ProblemConsequence
Incomplete dimensioningThe factory estimates by scale; the finished stand does not match the render
No node detailsBuilt from experience on site; structural safety cannot be guaranteed
Materials named but not specifiedWrong materials purchased, rework
Power layout conflicts with structural drawingsLight positions clash with structure, changed on site at the last minute
Multiple drawing versions in useThe factory builds from old drawings, rework on site

CaseRelated projects

Siquan New Materials · Stuttgart 2025
Siquan New Materials · Stuttgart 2025
Minimal tech aesthetic · Structural development and overseas delivery
SANY at bauma 2026
SANY at bauma 2026
Custom stand at a major trade fair · From render to construction drawings